Trithor Termite Protection
Protect Your Building.

Effective & Long-Lasting. Guard your property against termites with Trithor, the leading physical termite protection system.

Key Features & Benefits

Long-Term Protection

Trithor offers at least 50 years of termite protection, safeguarding your property for decades.

Advanced Solution

Uniquely combines physical barriers with chemical deterrents (deltamethrin) for enhanced prevention.

Effective & Less Intrusive

A reliable, less intrusive defence option compared to typical chemical barrier methods.

Environmentally Friendly

Installed during construction with minimal soil disturbance. GreenTag Certified.

Installation Manual Extracts & Technical Drawings

Looking for specific architectural details? Access our dedicated technical page containing manual extracts, cross-section drawings, and material specifications.

Installation of Trithor Termite Management System

Trithor integrates seamlessly with all stages of construction. Below are the key installation areas and requirements.

1. Penetrations

Installation around all service penetrations through the slab to prevent termite entry via these vulnerable points.

Site Requirements:

Clear area around pipes, no obstructions like steel reinforcement or lagging, ensuring collars can be fitted properly.

Installation Process:

Collars are fitted with cable ties, positioned entirely within the slab to ensure they are neither visible above the slab post-pour nor placed too low beneath the moisture barrier.

Penetrations
Perimeter

2. Perimeter

A continuous barrier installed around the perimeter of the building's slab to prevent termite ingress from the edges.

Site Requirements:

Clean and smooth concrete slab edge with at least 75mm of exposed concrete, formwork and moisture barriers removed, and all steelwork in place.

Installation Process:

Trithor system is fixed to the top of the slab using nails and glue, adjusting the product width based on wall type and ensuring the layout does not interfere with frame locations.

3. Bearers and Joists

Termite protection for the sub-floor area, particularly important in raised buildings with wooden floor structures.

Site Requirements:

Level base with all brick footings at the correct height and on the same plane, area free of debris, with stumps and brick piers in place.

Installation Process:

The system is integrated with the bearers and joists, ensuring seamless incorporation into the building's structure for effective termite protection.

Bearers and Joists
Retaining Walls

4. Retaining Walls

Protection for retaining walls that may be susceptible to termite infestation, ensuring termites cannot use these structures to bypass perimeter defences.

Site Requirements:

Walls must be fully waterproofed prior to installation to prevent moisture from compromising the barrier.

Installation Process:

Specifics depend on the construction of the retaining wall and chosen termite barrier system, ensuring a tight seal against termite entry.

5. Under Slab Treatments

Barrier installed under the concrete slab, providing a foundational layer of termite protection for the entire building.

Site Requirements:

Black plastic moisture barrier correctly installed, no reinforcing steel on top of the pads, and smooth, imperfection-free concrete surface.

Installation Process:

Ensures a continuous termite barrier beneath the slab, with particular attention to the placement of collars and ensuring no breaches in the moisture barrier.

Under Slab

Builder & Trade Responsibilities

Builders must ensure all trades understand their impact on the termite system.

Brick Layers

Must ensure the termite barrier system is properly integrated into the course of bricks without compromising its integrity. Communication should cover how the barrier interacts with mortar.

Plumbers

Critical to prevent pipe installations from breaching the barrier. Specialized collars must be installed before the slab is poured. Plumbers must NOT disturb these.

Concreters

Slab surface must be clean, smooth, and free of debris, with a minimum of 75mm of exposed concrete above the formwork for perimeter barriers.

Steel Workers

Careful installation around steel columns is required to avoid gaps. The barrier must be fitted correctly around any steel elements embedded in the slab.

Carpenters

Must understand the layout of the barrier, particularly around the slab edge. Frame installation must not disrupt the barrier or penetrate it in a way that compromises effectiveness.

Inspection

Coordination with Tri4

We can be on site with short notice. If the product is damaged, immediate communication is necessary for repair and recertification to ensure compliance with Australian standards.

Maintenance & Inspection

The Trithor system is designed to be maintenance-free. However, building owners must arrange annual termite inspections to comply with AS 3660.1.

Notify us of any renovations, extensions, or landscaping changes, as a reassessment may be necessary.

Trithor Comparison

Compare Trithor

See how Trithor excels against other termite protection systems. We offer superior durability, installation ease, and matched effectiveness.

Certified Compliance

Exceeding AS 3660.1 Standards

APVMA Approved | GreenTag Certified | 50 Year Warranty